| URS ID | URS Statement | Risk (H/M/L) | DQ Test Ref | IQ Test Ref | OQ Test Ref | PQ Test Ref | Evidence/Record | Result |
|---|---|---|---|---|---|---|---|---|
| URS-001 | Ensure the extrusion system maintains specified pressure during operation. | H | DQ-001 | IQ-001 | OQ-001 | PQ-001 | Pressure logs | Pass/Fail |
| URS-002 | Verify membrane pore size meets specifications for liposome production. | M | DQ-002 | IQ-002 | OQ-002 | PQ-002 | Pore size analysis report | Pass/Fail |
| URS-003 | Monitor temperature during the extrusion process to ensure optimal conditions. | H | DQ-003 | IQ-003 | OQ-003 | PQ-003 | Temperature records | Pass/Fail |
| URS-004 | Confirm flow rate is within defined parameters throughout the operation. | M | DQ-004 | IQ-004 | OQ-004 | PQ-004 | Flow rate measurements | Pass/Fail |
| URS-005 | Document all operational records for validation purposes. | L | DQ-005 | IQ-005 | OQ-005 | PQ-005 | Validation records | Pass/Fail |