Installation Qualification Protocol for Fitz Mill / Comminuting Mill

Objective: To verify that the Fitz Mill / Comminuting Mill is installed according to manufacturer specifications and meets the requirements outlined in the User Requirement Specification (URS).

Scope: This protocol applies to the Installation Qualification of the Fitz Mill / Comminuting Mill used for size reduction in the production area of solid dosage forms.

Responsibilities:

  • Validation Team: Ensure the protocol is executed and documented accurately.
  • Engineering: Responsible for equipment installation and initial setup.
  • Quality Assurance: Review and approve the IQ protocol and results.

Prerequisites:

  • Completion of equipment installation by engineering.
  • Availability of all necessary documentation, including URS and manufacturer’s specifications.
  • Training of personnel on the operation of the Fitz Mill.

Equipment Description:

The Fitz Mill / Comminuting Mill is a size reduction machine designed for processing solid dosage forms. It utilizes a high-speed rotating blade to achieve desired particle size distribution (PSD) through various screen sizes.

Test ID Procedure Acceptance Criteria Evidence
IQ-FM-01 Verify installation against manufacturer’s specifications. All components installed as per specifications. Installation checklist signed off.
IQ-FM-02 Check alignment and leveling of the equipment. Equipment is level and aligned according to specifications. Leveling report.
IQ-FM-03 Test speed settings of the mill. Speed settings within specified range. Speed test results log.
IQ-FM-04 Verify screen size and PSD. PSD matches specified parameters in URS. PSD analysis report.
See also  Vacuum Transfer System (Central) – Qualification Execution Checklist

Detailed Test Cases:

Test Case 1: Installation Verification

Objective: Ensure all components are installed as per manufacturer’s specifications.

Procedure: Cross-check installed components with the installation manual.

Acceptance Criteria: All components must be present and correctly installed.

Evidence: Installation checklist signed by the responsible engineer.

Test Case 2: Equipment Leveling

Objective: Confirm that the Fitz Mill is level and properly aligned.

Procedure: Use a leveling tool to check the equipment’s alignment.

Acceptance Criteria: The equipment must be level within ±0.5 degrees.

Evidence: Leveling report documenting the measurements.

Test Case 3: Speed Settings

Objective: Validate that the speed settings are operational and within specified limits.

Procedure: Operate the mill at various speed settings and measure actual speeds.

Acceptance Criteria: Speed settings must be within ±10% of specified values.

Evidence: Speed test results log with recorded speeds.

Test Case 4: Particle Size Distribution (PSD)

Objective: Assess the PSD after milling to ensure it meets specifications.

Procedure: Collect samples post-milling and conduct PSD analysis.

Acceptance Criteria: PSD must match specifications outlined in the URS.

Evidence: PSD analysis report detailing results.

Deviations:

Any deviations from the acceptance criteria must be documented, investigated, and approved by Quality Assurance before proceeding with further validation activities.