Objective

The objective of this protocol is to establish and document the operational qualification of the Fluid Bed Coater (Wurster/Bottom Spray) for the coating of pellets, ensuring compliance with regulatory standards and operational requirements.

Scope

This protocol applies to the Fluid Bed Coater located in the Production/Coating area and is intended for use in the coating of solid dosage forms (pellets).

Responsibilities

The following personnel are responsible for the execution and approval of this protocol:

  • Validation Team: Conducts the OQ testing and documentation.
  • Quality Assurance: Reviews and approves the protocol and results.
  • Production Personnel: Operate the equipment during qualification activities.

Prerequisites

  • Completion of Installation Qualification (IQ) for the Fluid Bed Coater.
  • Availability of necessary materials and personnel.
  • Review of User Requirement Specification (URS) Annex 11.

Equipment Description

The Fluid Bed Coater (Wurster/Bottom Spray) is utilized for the coating of pellets. Key features include:

  • Airflow temperature control
  • Spray rate adjustment
  • Filter differential pressure monitoring
  • PLC for operational control

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-01 Verify airflow temperature settings Temperature within specified range Temperature logs
OQ-02 Check spray rate functionality Spray rate meets defined specifications Flow rate measurements
OQ-03 Monitor filter differential pressure DP within acceptable limits DP readings
OQ-04 Validate PLC operations PLC functions as intended PLC logs
See also  Bag Washing / Blow-off Station (if used) – Qualification Execution Checklist

Detailed Test Cases

Test Case OQ-01: Airflow Temperature Verification

Procedure: Set the airflow temperature to the desired specification and monitor the readings.

Acceptance Criteria: Temperature must remain within the range specified in URS Annex 11.

Evidence: Documented temperature logs during testing.

Test Case OQ-02: Spray Rate Check

Procedure: Adjust the spray rate and measure the output.

Acceptance Criteria: The measured spray rate must align with the specifications outlined in the URS.

Evidence: Flow rate measurements and calibration records.

Test Case OQ-03: Filter Differential Pressure Monitoring

Procedure: Measure the differential pressure across the filter during operation.

Acceptance Criteria: DP must remain within the defined acceptable limits.

Evidence: Recorded DP readings during the test.

Test Case OQ-04: PLC Functionality Validation

Procedure: Execute a series of commands via the PLC and verify the responses.

Acceptance Criteria: PLC must execute commands without errors.

Evidence: PLC operational logs.

Deviations

Any deviations from the acceptance criteria must be documented and reviewed. A corrective action plan should be initiated for any critical deviations identified during testing.

Approvals

The protocol and results must be approved by the Quality Assurance and Validation teams. All signatures must be documented below:

Prepared By: ______________________

Approved By: ______________________

Date: ______________________