Fluid Bed Processor (FBP) – Granulation – PQ Protocol

Performance Qualification Protocol for Fluid Bed Processor in Granulation

Document Number: PQ-FBP-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Objective

The objective of this Performance Qualification (PQ) protocol is to validate the Fluid Bed Processor (FBP) for top spray granulation in the production of solid dosage forms.

Scope

This protocol applies to the Fluid Bed Processor used in the granulation process within the production area. It covers the qualification of the equipment to ensure it operates according to defined specifications and meets the acceptance criteria outlined in the URS Annex11.

Responsibilities

The Validation Team is responsible for the execution and documentation of the PQ protocol. The Quality Assurance (QA) department will review and approve the protocol and its results.

Prerequisites

Prior to executing this PQ protocol, the following must be completed:

  • Installation Qualification (IQ)
  • Operational Qualification (OQ)

Equipment Description

The Fluid Bed Processor (FBP) is designed for top spray granulation of solid dosage forms. It operates under controlled conditions to ensure uniform granule size and moisture content.

Test Plan

Test ID Procedure Acceptance Evidence
TP-001 Verify inlet temperature Inlet temperature within specified range Temperature logs
TP-002 Verify outlet temperature Outlet temperature within specified range Temperature logs
TP-003 Verify airflow rate Airflow rate meets specifications Airflow measurement records
TP-004 Verify spray rate Spray rate within defined limits Spray rate records
TP-005 Verify PLC functionality PLC operates correctly PLC test results
See also  Jet Mill / Micronizer – DQ Protocol

Detailed Test Cases

Test Case: TP-001 – Inlet Temperature Verification

Procedure: Measure the inlet temperature during operation. Compare with the specified range.

Acceptance Criteria: Inlet temperature must be within the specified range.

Evidence: Document the temperature readings and confirm compliance.

Test Case: TP-002 – Outlet Temperature Verification

Procedure: Measure the outlet temperature during operation. Compare with the specified range.

Acceptance Criteria: Outlet temperature must be within the specified range.

Evidence: Document the temperature readings and confirm compliance.

Test Case: TP-003 – Airflow Rate Verification

Procedure: Measure the airflow rate during operation. Verify against specifications.

Acceptance Criteria: Airflow rate must meet specifications.

Evidence: Document airflow measurements and confirm compliance.

Test Case: TP-004 – Spray Rate Verification

Procedure: Measure the spray rate during operation. Compare to defined limits.

Acceptance Criteria: Spray rate must be within defined limits.

Evidence: Document spray rate measurements and confirm compliance.

Test Case: TP-005 – PLC Functionality Verification

Procedure: Test all PLC functions during operation.

Acceptance Criteria: PLC must operate correctly without errors.

Evidence: Document PLC test results and confirm compliance.

Deviations

Any deviations from the acceptance criteria must be documented and reviewed. A root cause analysis should be performed, and corrective actions must be implemented as necessary.

Approvals

Prepared By: [Insert Name]

Approved By: [Insert Name]