Fluid Bed Processor (FBP) – Granulation – Qualification Execution Checklist

Qualification Execution Checklist for Fluid Bed Processor (FBP) – Granulation

Equipment Information

Equipment: Fluid Bed Processor (FBP) – Granulation

Subcategory: Solid Dosage Form (OSD)

Area: Production/Granulation

DQ/IQ/OQ/PQ: Yes/Yes/Yes/Yes

CSV Required: Yes

Pre-start Checks

  • Training completed for all personnel involved
  • Standard Operating Procedures (SOPs) approved
  • User Requirements Specification (URS) approved
  • Regulatory Affairs (RA) approval obtained

Calibration/PM Status Verification

  • Calibration status verified
  • Preventive Maintenance (PM) status verified

Protocol Readiness and Approvals

  • Qualification Protocol prepared
  • Protocol approvals obtained from all necessary stakeholders

Execution Controls

  • Good Documentation Practices (GDP) followed
  • Data recorded accurately during execution
  • Deviations documented and addressed

Review and Approvals

  • Engineering review completed
  • Validation review completed
  • Quality Assurance (QA) review completed
See also  Vacuum Transfer System (Central) – OQ Protocol