Objective

The objective of this Operational Qualification (OQ) protocol is to verify that the Glass Lined Reactor (GLR) operates according to predefined specifications and meets the requirements set forth in the User Requirement Specification (URS) and regulatory guidelines including Annex 11 and Annex 15.

Scope

This protocol applies to the Glass Lined Reactor (GLR) used in the production area for chemical synthesis reactions impacting product quality directly. The OQ will cover all critical parameters associated with the operation of the GLR.

Responsibilities

  • Validation Team: Responsible for executing the OQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the OQ documentation.
  • Production Personnel: Responsible for operating the GLR during the qualification process.

Prerequisites

  • Installation Qualification (IQ) must be completed and approved.
  • All necessary training for personnel operating the GLR must be completed.
  • All required materials and tools must be available for testing.

Equipment Description

The Glass Lined Reactor (GLR) is designed for chemical synthesis and purification processes. It features a glass-lined interior that provides excellent resistance to corrosive chemicals and offers a controlled environment for reactions.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-GLR-001-T1 Verify temperature control functionality Temperature maintained within ±2°C of set point Temperature log
OQ-GLR-001-T2 Verify pressure control functionality Pressure maintained within specified limits Pressure log
OQ-GLR-001-T3 Verify agitation performance Agitation speed within ±10% of set point Agitation log
OQ-GLR-001-T4 Verify reaction control via PLC PLC audit trail shows accurate recording of parameters PLC audit report
See also  Blister Packing Machine (Thermoform) – Equipment Validation SOP

Detailed Test Cases

Test Case 1: Temperature Control

Procedure: Set the GLR to a specific temperature and monitor the actual temperature. Record the data over a specified period.

Acceptance Criteria: Temperature maintained within ±2°C of set point.

Evidence: Temperature log showing set point and actual readings.

Test Case 2: Pressure Control

Procedure: Set the GLR to a specific pressure and monitor the actual pressure. Record the data over a specified period.

Acceptance Criteria: Pressure maintained within specified limits.

Evidence: Pressure log showing set point and actual readings.

Test Case 3: Agitation Performance

Procedure: Set the agitation speed and monitor the actual speed. Record the data over a specified period.

Acceptance Criteria: Agitation speed within ±10% of set point.

Evidence: Agitation log showing set point and actual readings.

Test Case 4: PLC Reaction Control

Procedure: Initiate a reaction and monitor the PLC for proper recording of parameters.

Acceptance Criteria: PLC audit trail shows accurate recording of parameters.

Evidence: PLC audit report showing recorded parameters during the reaction.

Deviations

Any deviations from the acceptance criteria will be documented and assessed for impact on the qualification status. A root cause analysis will be performed, and corrective actions will be implemented as necessary.

Approvals

This protocol must be reviewed and approved by the Quality Assurance department prior to execution. All results must be documented and reviewed following the completion of the OQ testing.