Purpose

This SOP outlines the validation requirements for the Implant Inspection System used to ensure the integrity of drug-eluting and biodegradable implants.

Scope

This procedure applies to the validation of the Implant Inspection System utilized in the production area for implant integrity inspection.

Definitions

  • DQ: Design Qualification
  • IQ: Installation Qualification
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • CSV: Computer System Validation

Roles

  • Validation Team: Responsible for executing the validation activities.
  • Quality Assurance: Oversees compliance with validation protocols.
  • Production Personnel: Operate the Implant Inspection System.

Lifecycle Procedure

  1. Conduct Design Qualification (DQ) to ensure system meets user requirements.
  2. Perform Installation Qualification (IQ) to verify installation against specifications.
  3. Execute Operational Qualification (OQ) to confirm system operates within defined limits.
  4. Carry out Performance Qualification (PQ) to validate the system under actual production conditions.

GDP Controls

Good Documentation Practices (GDP) must be followed throughout the validation process to ensure data integrity and traceability.

Acceptance Criteria Governance

Acceptance criteria will be defined in the User Requirements Specification (URS) and validated against Annex 11 of the relevant regulations.

Calibration/PM Governance

Calibration and preventive maintenance (PM) activities must be conducted according to the manufacturer’s specifications and documented accordingly.

Change Control Triggers

Any changes to the equipment, software, or processes that may impact the validation status must initiate a change control process.

See also  Crystallizer – Validation Summary Report (VSR) Template

Revalidation Triggers and Periodic Review

Revalidation is required every 12 months or when significant changes occur to the system or process.

Records/Attachments List

  • Validation Protocols
  • Validation Reports
  • Calibration Certificates
  • Change Control Documentation
  • Training Records