Objective

The objective of this Performance Qualification (PQ) protocol is to validate the Jacketed Mixing Vessel (SS) for the manufacturing of creams, gels, and lotions, ensuring that it meets the defined critical parameters and acceptance criteria.

Scope

This protocol applies to the Jacketed Mixing Vessel used in the production area for the manufacture of semi-solid products, specifically creams, gels, and lotions, where the product impact is direct and criticality is deemed critical.

Responsibilities

The following personnel are responsible for the execution and approval of this PQ protocol:

  • Validation Team: Execution of the protocol and data collection.
  • Quality Assurance: Review and approval of the protocol and results.
  • Production Team: Operation of the equipment during the qualification process.

Prerequisites

Prior to executing this protocol, the following prerequisites must be met:

  • Equipment must be installed and operational.
  • All relevant Standard Operating Procedures (SOPs) must be available.
  • Personnel must be trained on the equipment and PQ process.

Equipment Description

The Jacketed Mixing Vessel (SS) is designed for the production of semi-solid formulations. It features:

  • Temperature control system
  • Agitation mechanism with variable speed
  • PLC for process monitoring and logging

Detailed Test Cases

PQ-001: Temperature Control Verification

Procedure: Set the temperature to the specified setpoint and monitor for stability over a defined period.

Acceptance Criteria: Temperature must remain within ±2°C of the setpoint.

Evidence: Documented PLC logs and temperature records.

PQ-002: Agitation Speed Verification

Procedure: Set the agitation speed and verify using calibrated equipment.

Acceptance Criteria: Agitation speed must remain within ±10% of the setpoint.

Evidence: Documented PLC logs and speed records.

PQ-003: Hold Time Verification

Procedure: Monitor the hold time during the mixing process.

Acceptance Criteria: Hold time must comply with URS Annex 11 specifications.

Evidence: Documented PLC logs and time records.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis will be performed to determine the impact on the product quality and process.

Approvals

Prepared by: ______________________ Date: __________

Reviewed by: ______________________ Date: __________

Approved by: ______________________ Date: __________