Objective

The objective of this Performance Qualification (PQ) protocol is to verify that the Labeling Machine consistently applies labels accurately in compliance with the user requirements specified in URS Annex11.

Scope

This protocol applies to the Labeling Machine used in the packaging area for the production of suppositories and implants. It includes all activities necessary to validate the equipment’s performance in labeling.

Responsibilities

  • Validation Team: Responsible for executing the PQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the PQ documentation.
  • Maintenance Team: Responsible for ensuring the equipment is maintained and calibrated prior to PQ execution.

Prerequisites

  • Equipment installation and operational qualifications must be completed.
  • Staff training on the use of the Labeling Machine must be completed.
  • All necessary materials (labels, products) must be available.

Equipment Description

The Labeling Machine is designed for applying labels to suppositories and implants. It features automatic label placement and has the capability to generate audit trail logs for placement accuracy.

See also  Tangential Flow Filtration (TFF) System – Qualification Execution Checklist

Test Plan

Test ID Procedure Acceptance Evidence
PQ-001-01 Verify label placement accuracy Labels placed within ±1mm of target position Audit trail logs, photographs
PQ-001-02 Check audit trail logs for completeness All logs are complete and accessible Audit trail log review

Detailed Test Cases

Test Case ID: PQ-001-01

Procedure: Run the Labeling Machine with a batch of test products. Measure the placement of labels on each product.

Acceptance Criteria: Labels must be placed within ±1mm of the target position.

Evidence: Document results in the PQ report, including photographs and audit trail logs.

Test Case ID: PQ-001-02

Procedure: Review the audit trail logs generated during the labeling process.

Acceptance Criteria: All logs must be complete, showing no gaps in data.

Evidence: Include a summary of the audit trail log review in the PQ report.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis should be conducted, and corrective actions must be implemented.

Approvals

Prepared by: ____________________ (Validation Team Lead)

Date: ____________________

Reviewed by: ____________________ (Quality Assurance)

Date: ____________________