Leak Test Machine (Container Closure) – DQ Protocol

Design Qualification Protocol for Leak Test Machine in Nasal & Otic Products

Document Number: DQ-001

Version: 1.0

Date: [Insert Date]

Prepared By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Design Qualification (DQ) Protocol is to verify that the Leak Test Machine for container closure meets the specified requirements for the production of nasal and otic products.

Scope

This protocol applies to the Leak Test Machine utilized in the Production/QC area for verifying container integrity of nasal and otic products, both sterile and non-sterile.

Responsibilities

  • Validation Team: Responsible for executing the DQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the DQ protocol and results.
  • Engineering: Responsible for ensuring the equipment is installed and operational prior to DQ execution.

Prerequisites

  • Installation Qualification (IQ) must be completed and approved.
  • Operational Qualification (OQ) must be completed and approved.
  • Training of personnel on the use of the Leak Test Machine must be completed.

Equipment Description

The Leak Test Machine is an instrument designed to verify the integrity of container closures for nasal and otic products. It employs advanced leak detection technology to ensure compliance with regulatory standards.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
DQ-001-01 Verify leak detection sensitivity Must detect leaks ≤ 0.5 mL/min Test report and audit trail
DQ-001-02 Review audit trail functionality Audit trail must capture all test events Audit trail log
See also  Air Shower – PQ Protocol

Detailed Test Cases

Test Case 1: Leak Detection Sensitivity

Objective: To verify that the machine can detect leaks below the specified threshold.

Procedure: Conduct a series of tests using containers known to have specific leak rates.

Acceptance Criteria: The machine must successfully identify all leaks ≤ 0.5 mL/min.

Evidence: Documented test results and machine readings.

Test Case 2: Audit Trail Review

Objective: To ensure that the audit trail captures all relevant data during operation.

Procedure: Perform a test run and review the audit trail for completeness.

Acceptance Criteria: All events must be logged with appropriate timestamps and user information.

Evidence: Printed audit trail log showing all entries.

Deviations

Any deviations from the acceptance criteria must be documented and justified. A deviation report must be submitted for review and approval.

Approvals

Prepared By: [Insert Name]
Date: [Insert Date]

Approved By: [Insert Name]
Date: [Insert Date]

Data Integrity Checks

Since CSV is required, the following data integrity checks will be implemented:

  • Validation of data entry against predefined formats.
  • Regular backups of audit trails to prevent data loss.
  • Access controls to ensure only authorized personnel can modify data.