Validation Summary Report (VSR)
Equipment: LVP/SVP Compounding Vessel (Jacketed SS)
Subcategory: IV Infusions (LVP/SVP – Bags/Bottles)
Area: Production
DQ/IQ/OQ/PQ Flags
Design Qualification (DQ): Yes
Installation Qualification (IQ): Yes
Operational Qualification (OQ): Yes
Performance Qualification (PQ): Yes
Acceptance Criteria Reference
URS Annex 11, Annex 15
Key Critical Parameters
- Agitation
- Temperature
- Hold Time
- PLC Audit Trail
Requalification Frequency
12 Months
Summary
This Validation Summary Report outlines the validation activities performed for the LVP/SVP Compounding Vessel (Jacketed SS) utilized in the production of IV infusions. It includes Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) activities.
Scope and Boundaries
The scope of this validation includes all aspects of the LVP/SVP Compounding Vessel’s operation, focusing on key critical parameters related to the compounding of IV infusions. The boundaries encompass the equipment’s functionality within the production area.
Executed Protocol List
- DQ Protocol – LVP/SVP Compounding Vessel
- IQ Protocol – LVP/SVP Compounding Vessel
- OQ Protocol – LVP/SVP Compounding Vessel
- PQ Protocol – LVP/SVP Compounding Vessel
Deviations Summary
No significant deviations were noted during the validation process. All activities were executed as per the approved protocols.
CPP Verification Summary
All critical control parameters (Agitation, Temperature, Hold Time, PLC Audit Trail) were verified and met the acceptance criteria as outlined in the URS. Documentation of these verifications is attached.
Conclusion
The validation activities for the LVP/SVP Compounding Vessel (Jacketed SS) have been successfully completed. The equipment has been qualified for use in the production of IV infusions, and it meets all specified requirements.
Attachments Index
- Attachment 1: DQ Protocol Report
- Attachment 2: IQ Protocol Report
- Attachment 3: OQ Protocol Report
- Attachment 4: PQ Protocol Report
- Attachment 5: Verification Documentation
Approvals
Prepared by: ____________________
Approved by: ____________________
Date: ____________________