Mixing Tank (Non-Jacketed) – Deviation Impact Assessment

Deviation Impact Assessment Template

Deviation Details

Equipment: Mixing Tank (Non-Jacketed)

Area: Production/Manufacturing

Criticality: Major

Product Impact: Direct

Deviation Classification

Classification: Major Deviation

Product/Patient Impact

The deviation has a direct impact on the product quality and patient safety. Immediate assessment and corrective measures are required.

Data Integrity Impact

Data integrity may be compromised due to the deviation, necessitating a thorough review of all related data.

Affected Batches/Studies

List of affected batches/studies:

  • Batch #001
  • Batch #002
  • Study #A01

Investigation

An investigation will be initiated to determine the root cause of the deviation. All relevant documentation and personnel will be involved in this process.

Corrective and Preventive Actions (CAPA)

CAPA measures will be developed based on the findings of the investigation. These may include retraining of personnel, equipment recalibration, or process adjustments.

Re-test/Requalification Decision

A decision will be made regarding the need for re-testing or re-qualification of the equipment based on the impact assessment outcomes.

Quality Assurance (QA) Disposition

The final disposition will be determined by QA after reviewing the investigation results and proposed CAPA measures.

See also  Glass Lined Reactor (GLR) – Deviation Impact Assessment