Installation Qualification Protocol for Multi Mill Equipment

Objective: To establish that the Multi Mill is installed according to manufacturer specifications and is operationally capable of milling/sizing powders/granules as per defined acceptance criteria.

Scope: This protocol applies to the installation qualification of the Multi Mill used in the production area for solid dosage form manufacturing.

Responsibilities:

  • Validation Team: Responsible for conducting the IQ protocol and documenting results.
  • Maintenance Team: Responsible for ensuring the equipment is installed and maintained according to specifications.
  • Quality Assurance: Responsible for reviewing and approving the IQ protocol and results.

Prerequisites:

  • Installation of equipment must be completed.
  • Utilities (electricity, water, etc.) must be verified and functional.
  • Personnel must be trained on the operation of the Multi Mill.

Equipment Description:

The Multi Mill is designed for milling and sizing powders and granules. It operates using a rotor mechanism that ensures uniform particle size distribution.

Test ID Procedure Acceptance Criteria Evidence
IQ-01 Verify rotor speed settings Rotor speed must be within specified range as per URS Calibration report
IQ-02 Inspect screen integrity No visible damage or wear Inspection log
IQ-03 Measure output particle size distribution (PSD) Output PSD must meet specifications outlined in URS Test results

Detailed Test Cases:

Test Case 1: Verify Rotor Speed Settings

Procedure: Measure the rotor speed using a calibrated tachometer.

See also  Oscillating Granulator – DQ Protocol

Acceptance Criteria: Rotor speed must be within the specified range as per URS.

Evidence: Document calibration report showing rotor speed measurements.

Test Case 2: Inspect Screen Integrity

Procedure: Visually inspect the screen for any signs of damage or wear.

Acceptance Criteria: No visible damage or wear should be present.

Evidence: Document results in the inspection log.

Test Case 3: Measure Output Particle Size Distribution (PSD)

Procedure: Collect samples of the output and analyze using appropriate particle size analysis equipment.

Acceptance Criteria: Output PSD must meet specifications outlined in URS.

Evidence: Test results documented and filed.

Deviations:

Any deviations from the acceptance criteria must be documented and investigated. Corrective actions should be taken as necessary.