Performance Qualification Protocol for Multi Mill in Solid Dosage Form
Meta Description: This document outlines the Performance Qualification (PQ) protocol for the Multi Mill used in Solid Dosage Form manufacturing, focusing on critical parameters and acceptance criteria.
Tags: Equipment Validation, Multi Mill, PQ Protocol, Solid Dosage Form, Production, Milling
Objective
The objective of this Performance Qualification (PQ) protocol is to validate the Multi Mill’s performance in milling and sizing powders/granules to ensure compliance with defined acceptance criteria.
Scope
This protocol applies to the Multi Mill used in the Production/Milling area for the direct impact on the product quality of solid dosage forms.
Responsibilities
- Validation Team: Responsible for executing the PQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the protocol and results.
- Production Team: Responsible for operating the Multi Mill as per the protocol.
Prerequisites
- Multi Mill installed and operational.
- Operators trained on equipment use.
- Standard Operating Procedures (SOPs) in place.
Equipment Description
The Multi Mill is a versatile equipment used for milling and sizing powders and granules in the pharmaceutical industry. It operates at variable rotor speeds and utilizes screens to achieve desired particle size distribution (PSD).
Test Plan
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| PQ-001 | Measure rotor speed during operation. | Rotor speed within specified range as per URS. | Calibration report. |
| PQ-002 | Inspect screen integrity before and after milling. | No damage or wear on screen. | Inspection log. |
| PQ-003 | Analyze output particle size distribution (PSD). | PSD meets specifications as per URS. | PSD analysis report. |
Detailed Test Cases
Test Case 1: Rotor Speed Measurement
Test ID: PQ-001
Procedure: Operate the Multi Mill at predetermined settings and measure the rotor speed using a calibrated tachometer.
Acceptance Criteria: Rotor speed must be within the specified range as per URS.
Evidence: Documented calibration report confirming rotor speed measurement.
Test Case 2: Screen Integrity Inspection
Test ID: PQ-002
Procedure: Visually inspect the screen before and after the milling process for any signs of damage or wear.
Acceptance Criteria: Screen must show no signs of damage or wear.
Evidence: Inspection log documenting the condition of the screen.
Test Case 3: Output PSD Analysis
Test ID: PQ-003
Procedure: Collect samples from the output and analyze for particle size distribution using appropriate analytical methods.
Acceptance Criteria: PSD must meet specifications as outlined in the URS.
Evidence: PSD analysis report detailing results.
Deviations
Any deviations from the established protocol must be documented and justified. A deviation report should be created and approved by the validation team and quality assurance.
Approvals