Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Overwrap Machine for IV bags is installed correctly and operates as intended, in compliance with relevant standards and specifications.

Scope

This protocol applies to the Installation Qualification of the Overwrap Machine used for applying overwrap to IV bags in the Packaging/Primary area. The validation process will ensure that the equipment meets the requirements specified in the User Requirement Specification (URS) Annex 11.

Responsibilities

  • Validation Team: Responsible for executing the IQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the IQ protocol and results.
  • Maintenance Team: Responsible for ensuring the machine is installed per specifications.

Prerequisites

  • Completion of equipment installation.
  • Availability of necessary documentation (URS, equipment manuals).
  • Training of personnel on equipment operation.

Equipment Description

The Overwrap Machine is designed to apply a protective overwrap to IV bags (both LVP and SVP). It ensures seal integrity and maintains product sterility during storage and transport.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-01 Verify installation of the Overwrap Machine components. All components installed as per manufacturer specifications. Installation checklist signed off by maintenance.
IQ-02 Check the calibration of the temperature control system. Temperature readings within acceptable range as per URS. Calibration certificate.
IQ-03 Test seal integrity at specified dwell times. Seals pass integrity tests as per acceptance criteria. Seal integrity test results.
IQ-04 Verify reject logic and audit trail functionality. Reject logic activates correctly; audit trail logs events. Audit trail report.
See also  Roller Compactor – Traceability Matrix (URS ↔ Tests)

Detailed Test Cases

Test ID: IQ-01

Procedure: Inspect all components of the Overwrap Machine to confirm correct installation.

Acceptance Criteria: All components must be installed according to the manufacturer’s specifications.

Evidence: Documented installation checklist signed by the maintenance team.

Test ID: IQ-02

Procedure: Perform calibration checks on the temperature control system.

Acceptance Criteria: Temperature readings must be within the acceptable range as defined in the URS.

Evidence: Calibration certificate must be provided and reviewed.

Test ID: IQ-03

Procedure: Conduct seal integrity testing at specified dwell times.

Acceptance Criteria: All seals must pass the integrity tests as per the acceptance criteria outlined in the URS.

Evidence: Results of the seal integrity tests must be documented.

Test ID: IQ-04

Procedure: Verify functionality of reject logic and audit trail.

Acceptance Criteria: Reject logic must activate as intended; audit trail must log all relevant events accurately.

Evidence: Audit trail report must be generated and reviewed.

Deviations

Any deviations from the acceptance criteria must be documented and assessed. A root cause analysis will be conducted for any critical deviations, and corrective actions will be implemented accordingly.

Approvals

Prepared by: [Name, Title]

Date: [Insert Date]

Reviewed by: [Name, Title]

Date: [Insert Date]

Approved by: [Name, Title]