Patch Inspection Machine (Vision System) – Traceability Matrix (URS ↔ Tests)

URS ID URS Statement Risk (H/M/L) DQ Test Ref IQ Test Ref OQ Test Ref PQ Test Ref Evidence/Record Result
URS-001 The system shall accurately detect patch dimensions. H DQ-001 IQ-001 OQ-001 PQ-001 Dimension Test Report Pass
URS-002 The system shall identify defects in patches. H DQ-002 IQ-002 OQ-002 PQ-002 Defect Inspection Log Pass
URS-003 The system shall maintain a reject logic for defective patches. M DQ-003 IQ-003 OQ-003 PQ-003 Reject Logic Audit Trail Pass
URS-004 The system shall provide an audit trail for all inspections. M DQ-004 IQ-004 OQ-004 PQ-004 Audit Trail Record Pass
URS-005 The system shall operate within specified environmental conditions. L DQ-005 IQ-005 OQ-005 PQ-005 Environmental Conditions Log Pass
See also  Suppository Base Melting Vessel (Jacketed SS) – Qualification Certificate Template