Peristaltic Pump (Binder Addition) – Validation Summary Report (VSR) Template

Validation Summary Report (VSR)

Equipment Information

Equipment: Peristaltic Pump (Binder Addition)

Subcategory: Solid Dosage Form (OSD)

Area: Production/Granulation

DQ/IQ/OQ/PQ Flags: Yes/Yes/Yes/Yes

Acceptance Criteria Reference: URS

Key Critical Parameters: Flow accuracy repeatability

Requalification Frequency: 12M

Summary

This report summarizes the validation activities performed for the Peristaltic Pump used in the Solid Dosage Form production area. The validation process includes Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) to ensure compliance with regulatory standards and operational requirements.

Scope and Boundaries

The scope of this validation encompasses the entire lifecycle of the Peristaltic Pump from installation through operational use in the granulation process. It includes all relevant procedures, protocols, and documentation necessary for ensuring the pump meets specified performance criteria.

Executed Protocol List

  • Design Qualification Protocol (DQP)
  • Installation Qualification Protocol (IQP)
  • Operational Qualification Protocol (OQP)
  • Performance Qualification Protocol (PQP)

Deviations Summary

No deviations were noted during the execution of the validation protocols. All processes adhered to the established acceptance criteria as outlined in the URS.

Critical Process Parameter (CPP) Verification Summary

The critical parameter of flow accuracy repeatability was verified through a series of tests conducted during OQ and PQ phases. Results indicated that the pump consistently met the acceptance criteria outlined in the URS.

Conclusion

The validation of the Peristaltic Pump (Binder Addition) is complete and demonstrates that the equipment is qualified for use in the Solid Dosage Form production area. The pump meets all required specifications and is deemed compliant with regulatory standards.

See also  High Shear Granulator (HSG) – PQ Protocol

Attachments Index

  • Appendix A: Design Qualification Report
  • Appendix B: Installation Qualification Report
  • Appendix C: Operational Qualification Report
  • Appendix D: Performance Qualification Report
  • Appendix E: Calibration Certificates

Approvals

Prepared by: [Name], [Title], [Date]

Reviewed by: [Name], [Title], [Date]

Approved by: [Name], [Title], [Date]