Pneumatic Conveying (Dense Phase) – Traceability Matrix (URS ↔ Tests)

URS ID URS Statement Risk (H/M/L) DQ Test Ref IQ Test Ref OQ Test Ref PQ Test Ref Evidence/Record Result
URS-001 The system shall ensure contained transfer with minimal segregation. M DQ-001 IQ-001 OQ-001 PQ-001 Record-001 Pass
URS-002 The system shall maintain specified pressure during operation. H DQ-002 IQ-002 OQ-002 PQ-002 Record-002 Pass
URS-003 The system shall achieve the required flow velocity for effective transfer. M DQ-003 IQ-003 OQ-003 PQ-003 Record-003 Fail
URS-004 The system shall be controlled by a PLC with necessary functionalities. L DQ-004 IQ-004 OQ-004 PQ-004 Record-004 Pass
See also  Sampling Booth (Downflow/RLAF) – Qualification Execution Checklist