Validation Summary Report (VSR)
Equipment: Purified Water Generation System (PW System)
Summary
This Validation Summary Report outlines the validation activities conducted for the Purified Water Generation System (PW System) in accordance with the established protocols and acceptance criteria. The system has been validated for compliance with URS Annex 11 and Annex 15 standards.
Scope / Boundaries
The scope of this validation encompasses the design qualification (DQ), installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) of the PW System. The boundaries include the entire water generation process and associated utilities.
Executed Protocol List
- DQ Protocol
- IQ Protocol
- OQ Protocol
- PQ Protocol
Deviations Summary
No deviations were noted during the validation process. All protocols were executed as planned, adhering to the acceptance criteria.
CPP Verification Summary
The following critical parameters were verified:
- Conductivity
- TOC (Total Organic Carbon)
- Flow Rate
- Temperature
- Pressure
- Audit Trail
All parameters met the established acceptance criteria as per URS Annex 11 and Annex 15.
Conclusion
The Purified Water Generation System has been successfully validated. It meets all critical parameters and is compliant with the relevant regulatory standards. The system is approved for use and will undergo requalification every 12 months.
Attachments Index
- Executed DQ Protocol
- Executed IQ Protocol
- Executed OQ Protocol
- Executed PQ Protocol
- Validation Summary Report
Approvals
Prepared by: ___________________ (Name, Title)
Reviewed by: ___________________ (Name, Title)
Approved by: ___________________ (Name, Title)