Document Control
Document ID: DQ-PWDL-001
Version: 1.0
Effective Date: [Insert Date]
Reviewed By: [Insert Name]
Approved By: [Insert Name]
Design Qualification Protocol for PW Distribution Loop
Objective: To ensure that the PW Distribution Loop is designed to meet the necessary requirements for the distribution of purified water in compliance with regulatory standards.
Scope: This protocol applies to the Design Qualification of the PW Distribution Loop used in the Utilities area for the distribution of purified water, impacting product quality directly.
Responsibilities:
- Validation Team: Responsible for executing the DQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the DQ protocol and results.
- Engineering: Responsible for providing necessary equipment specifications and design documentation.
Prerequisites:
- Completion of User Requirements Specification (URS).
- Availability of design documentation for the PW Distribution Loop.
- Approval from Quality Assurance for the DQ protocol.
Equipment Description: The PW Distribution Loop is designed to distribute purified water throughout the facility, ensuring compliance with regulatory standards for microbial control and temperature flow.
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| DQ-001 | Verify design specifications against URS. | All specifications must match URS Annex11 Annex15. | Design Specification Document. |
| DQ-002 | Conduct temperature flow validation. | Temperature must remain within specified limits. | Temperature Log. |
| DQ-003 | Perform microbial control assessment. | No microbial contamination detected. | Microbial Test Results. |
| DQ-004 | Review audit trail functionality. | Audit trail must capture all critical parameters. | Audit Trail Report. |
Detailed Test Cases
Test Case 1: Verify design specifications against URS.
- Review the design documentation.
- Ensure all specifications align with URS Annex11 Annex15.
Test Case 2: Conduct temperature flow validation.
- Monitor the temperature during operation.
- Document temperature readings over a specified period.
Test Case 3: Perform microbial control assessment.
- Collect samples from various points in the distribution loop.
- Send samples for microbial testing.
Test Case 4: Review audit trail functionality.
- Access the system’s audit trail.
- Verify that all critical parameters are logged appropriately.
Deviations
Any deviations from the acceptance criteria must be documented and assessed for impact on product quality. A corrective action plan must be developed and implemented.
Approvals
This DQ protocol must be reviewed and approved by the Quality Assurance team before execution.