PW Distribution Loop – PQ Protocol

Document Control

Document Number: PQ-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Performance Qualification Protocol for PW Distribution Loop

Objective: To validate the performance of the PW Distribution Loop to ensure it meets the specified requirements for distributing purified water.

Scope: This protocol applies to the Performance Qualification of the PW Distribution Loop within the Utilities area, focusing on direct product impact and criticality.

Responsibilities:

  • Validation Team: Conducting the PQ tests and documenting results.
  • Quality Assurance: Reviewing and approving the PQ protocol and results.
  • Maintenance Team: Ensuring the equipment is operational prior to testing.

Prerequisites:

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of relevant Standard Operating Procedures (SOPs).
  • Training of personnel involved in the PQ process.

Equipment Description:

The PW Distribution Loop is designed to distribute purified water throughout the facility, ensuring that it meets the necessary quality standards for pharmaceutical applications. The system includes temperature control, flow monitoring, and microbial control features.

Test ID Procedure Acceptance Criteria Evidence
PQ-01 Temperature Validation Temperature must remain within specified limits. Temperature logs and graphs.
PQ-02 Flow Rate Verification Flow rate must meet established specifications. Flow rate measurements and reports.
PQ-03 Microbial Control Testing No microbial contamination detected. Microbial test results and reports.
PQ-04 Audit Trail Review Audit trail must be complete and accurate. Audit trail documentation.
See also  Checkweigher (Inline) – Qualification Certificate Template

Detailed Test Cases:

PQ-01: Temperature Validation

  • Procedure: Monitor the temperature at various points in the distribution loop for a minimum of 24 hours.
  • Acceptance Criteria: Temperature must remain between [insert range] °C.
  • Evidence: Temperature logs must be reviewed and signed off by QA.

PQ-02: Flow Rate Verification

  • Procedure: Measure the flow rate at designated points using calibrated flow meters.
  • Acceptance Criteria: Flow rate must be [insert specification] L/min.
  • Evidence: Flow rate measurements must be documented and verified.

PQ-03: Microbial Control Testing

  • Procedure: Collect samples from the distribution loop and test for microbial contamination.
  • Acceptance Criteria: No microbial growth detected.
  • Evidence: Microbial test results must be documented and reviewed.

PQ-04: Audit Trail Review

  • Procedure: Review the system’s audit trail for completeness and accuracy.
  • Acceptance Criteria: All entries must be accounted for and accurate.
  • Evidence: Audit trail documentation must be signed off by QA.

Deviations:

Any deviations from the acceptance criteria must be documented and assessed for impact on product quality. A deviation report must be generated and approved by the Quality Assurance team.

Approvals:

Prepared By: [Insert Name] – [Insert Position]

Approved By: [Insert Name] – [Insert Position]

“`