PW Storage Tank – DQ Protocol

Document Control

Document Number: DQ-PWST-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approved By: [Insert Name]

Design Qualification Protocol for Purified Water Storage Tank

Meta Description: This document outlines the Design Qualification (DQ) protocol for the Purified Water Storage Tank in Utilities, focusing on critical parameters and acceptance criteria.

Tags: Design Qualification, Equipment Validation, PW Storage Tank, Utilities, Pharmaceutical

Objective

The objective of this Design Qualification (DQ) protocol is to ensure that the Purified Water (PW) Storage Tank meets the specified requirements for storing purified water, ensuring microbial integrity and temperature control.

Scope

This protocol applies to the Design Qualification of the Purified Water Storage Tank used in the Utilities area for the storage of purified water, which has a direct impact on product quality.

Responsibilities

  • Validation Team: Prepare and execute the DQ protocol.
  • Quality Assurance: Review and approve the DQ protocol.
  • Engineering: Provide technical specifications and support during the qualification process.

Prerequisites

  • Completion of User Requirement Specification (URS) for the PW Storage Tank.
  • Availability of necessary documentation and design drawings.
  • Approval from relevant stakeholders.

Equipment Description

The Purified Water Storage Tank is designed to store purified water for pharmaceutical manufacturing processes. It is constructed from materials that ensure microbial integrity and is equipped with temperature control mechanisms.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
T1 Verify temperature control functionality Temperature maintained within specified limits Temperature logs
T2 Microbial integrity testing No microbial contamination detected Microbial test results
See also  Automated Visual Inspection Machine – Equipment Validation SOP

Detailed Test Cases

Test Case 1: Verify Temperature Control Functionality

Objective: Ensure that the temperature control system maintains the required temperature for purified water storage.

Procedure: Monitor the temperature of the PW Storage Tank over a 24-hour period.

Expected Result: Temperature remains within the specified range as per URS Annex15.

Test Case 2: Microbial Integrity Testing

Objective: Confirm that the storage tank maintains microbial integrity.

Procedure: Collect water samples from the tank and conduct microbial analysis.

Expected Result: No microbial contamination detected in the samples.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A corrective action plan should be implemented if critical parameters are not met.

Approvals

All sections of this protocol must be reviewed and approved by the Validation Team, Quality Assurance, and Engineering before execution.