Document Control:
Document ID: IQ-TP-001
Version: 1.0
Effective Date: 2023-10-01
Reviewed By: [Name]
Approval Date: [Date]
Installation Qualification Protocol for Sanitary Transfer Pump
Objective: To ensure that the Sanitary Transfer Pump is installed correctly and operates according to specified requirements, ensuring product integrity during the transfer of bulk solutions.
Scope: This protocol applies to the Installation Qualification of the Sanitary Transfer Pump used in the production area for IV infusions (LVP/SVP – Bags/Bottles).
Responsibilities:
- Validation Team: Prepare and execute the IQ protocol.
- Quality Assurance: Review and approve the protocol and results.
- Maintenance Team: Assist in installation and troubleshooting.
Prerequisites:
- Completion of equipment installation.
- Availability of necessary documentation (URS, SOPs).
- Training of personnel on equipment operation.
Equipment Description:
The Sanitary Transfer Pump (Mag Drive/Centrifugal) is designed for the transfer of bulk solutions in a sterile environment. It features a flow shear seal for maintaining integrity during operation.
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| IQ-TP-01 | Verify pump installation according to manufacturer’s specifications. | All components must be installed as per the installation manual. | Photographic evidence and installation checklist. |
| IQ-TP-02 | Check flow shear seal integrity. | No leaks or pressure loss during operation. | Pressure test results and inspection report. |
Detailed Test Cases:
- Test Case ID: IQ-TP-01
- Procedure: Inspect all mechanical and electrical connections.
- Expected Result: All connections are secure and meet specifications.
- Actual Result: [To be filled during execution]
- Test Case ID: IQ-TP-02
- Procedure: Conduct a pressure test on the flow shear seal.
- Expected Result: Seal maintains integrity under operational pressure.
- Actual Result: [To be filled during execution]
Deviations:
Any deviations from the acceptance criteria must be documented and investigated. Corrective actions should be implemented as necessary.
Approvals:
__________________________
Validation Team Lead
__________________________
Quality Assurance
__________________________
Maintenance Team