Solvent Storage Tank (SS / GL) – IQ Protocol

Installation Qualification Protocol for Solvent Storage Tank in API Manufacturing

Document Number: IQ-SS-001

Version: 1.0

Effective Date: [Insert Date]

Review Date: [Insert Date]

Prepared By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Solvent Storage Tank (SS/GL) is installed correctly and functions according to the specified requirements for the storage of solvents in API manufacturing.

Scope

This protocol applies to the Solvent Storage Tank located in the Production Area and includes all associated systems and components necessary for its operation.

Responsibilities

The Validation Team is responsible for executing this protocol, ensuring compliance with regulatory requirements, and documenting all findings. The Quality Assurance (QA) department will review and approve the protocol and its outcomes.

Prerequisites

  • Completion of installation of the Solvent Storage Tank.
  • Availability of operation manuals and technical specifications.
  • Training of personnel on equipment use and safety protocols.

Equipment Description

The Solvent Storage Tank (SS/GL) is designed to store solvents used in chemical synthesis and purification processes. It features a level indicator, temperature control, pressure monitoring, and a PLC audit trail for data integrity.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-01 Verify installation against design specifications. Installation meets all specified design requirements. Installation checklist signed off by the installer.
IQ-02 Check functionality of level, temperature, and pressure sensors. All sensors report accurate readings within specified ranges. Calibration certificates and sensor readouts.
IQ-03 Review PLC audit trail logs for data integrity. Logs show no discrepancies or unauthorized access. Audit trail log report.
See also  Bin Blender / IBC Blender – Qualification Execution Checklist

Detailed Test Cases

Test Case: IQ-01

Procedure: Verify installation against design specifications.

Acceptance Criteria: Installation meets all specified design requirements.

Evidence: Installation checklist signed off by the installer.

Test Case: IQ-02

Procedure: Check functionality of level, temperature, and pressure sensors.

Acceptance Criteria: All sensors report accurate readings within specified ranges.

Evidence: Calibration certificates and sensor readouts.

Test Case: IQ-03

Procedure: Review PLC audit trail logs for data integrity.

Acceptance Criteria: Logs show no discrepancies or unauthorized access.

Evidence: Audit trail log report.

Deviations

Any deviations from the acceptance criteria must be documented and assessed for impact on the validation process. Corrective actions should be implemented as necessary.

Approvals

Prepared By: ______________________

Date: ______________________

Approved By: ______________________

Date: ______________________