Split Butterfly Valve (SBV) Transfer System – DQ Protocol

Document Number: DQ-OSD-SBV-001

Version: 1.0

Effective Date: YYYY-MM-DD

Prepared By: [Your Name]

Approved By: [Approver’s Name]

Design Qualification Protocol for Split Butterfly Valve Transfer System

This document outlines the Design Qualification (DQ) protocol for the Split Butterfly Valve Transfer System used in Solid Dosage Form production.

Tags: Equipment Validation, Solid Dosage Form, Design Qualification, Transfer System

Objective

The objective of this Design Qualification Protocol is to ensure that the Split Butterfly Valve Transfer System operates as intended and meets the specified requirements for contained docking and transfer in Solid Dosage Form production.

Scope

This protocol applies to the Split Butterfly Valve Transfer System utilized in the Production/Containment area for direct product impact, classified as critical equipment.

Responsibilities

The following personnel are responsible for executing this protocol:

  • Validation Team: Execute the testing and document results.
  • Quality Assurance: Review and approve the protocol and results.
  • Engineering: Provide technical support and equipment specifications.

Prerequisites

  • Completion of installation and operational qualification (IQ/OQ).
  • Availability of necessary documentation (URS, design specifications).
  • Personnel trained in validation procedures.

Equipment Description

The Split Butterfly Valve Transfer System is designed for contained docking and transfer of materials in Solid Dosage Form production. It ensures a secure containment seal during operation, minimizing the risk of product exposure.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
DQ-001 Verify containment seal integrity during docking. Seal integrity confirmed with no leaks. Leak test report.
DQ-002 Test operational functionality of the SBV system. System operates without errors. Operational log.
See also  Weighing Balance (Platform/Floor) – Validation Summary Report (VSR) Template

Detailed Test Cases

Test Case DQ-001: Containment Seal Integrity

Procedure: Initiate docking process and monitor for leaks using appropriate detection methods.

Acceptance Criteria: No leaks detected during the test.

Evidence: Documented results from the leak test.

Test Case DQ-002: Operational Functionality

Procedure: Execute a series of operational tests to ensure the system functions as intended.

Acceptance Criteria: All operations performed without error.

Evidence: Operational logs and any error reports.

Deviations

Any deviations from the acceptance criteria must be documented and assessed for impact on the validation process. A corrective action plan should be established as necessary.

Approvals

Prepared By: ______________________ Date: ___________

Approved By: ______________________ Date: ___________