Split Butterfly Valve (SBV) Transfer System – PQ Protocol

Document Control:

Document ID: PQ-OSD-SBV-001

Version: 1.0

Effective Date: 2023-10-01

Review Date: 2024-10-01

Performance Qualification Protocol for Split Butterfly Valve Transfer System

Meta Description: This document outlines the Performance Qualification Protocol for the Split Butterfly Valve Transfer System used in Solid Dosage Form equipment validation.

Tags: Equipment Validation, Performance Qualification, Solid Dosage Form, Split Butterfly Valve, Containment

Objective

The objective of this Performance Qualification (PQ) protocol is to demonstrate that the Split Butterfly Valve (SBV) Transfer System operates consistently within defined parameters to ensure containment seal integrity during docking and transfer operations.

Scope

This protocol applies to the Split Butterfly Valve Transfer System used in the Production/Containment area for Solid Dosage Form (OSD) applications. It encompasses the evaluation of the system’s performance in relation to containment seal integrity docking.

Responsibilities

The responsibilities for this protocol are as follows:

  • Validation Team: Prepare, execute, and document the PQ protocol.
  • Quality Assurance: Review and approve the PQ protocol and results.
  • Production Personnel: Operate the SBV Transfer System during testing.

Prerequisites

Prior to executing this PQ protocol, the following prerequisites must be met:

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of all necessary equipment and materials.
  • Personnel trained in the operation of the SBV Transfer System.

Equipment Description

The Split Butterfly Valve Transfer System is designed for contained docking and transfer of solid dosage forms. It ensures a secure seal during the transfer process to maintain product integrity and prevent contamination.

See also  Pneumatic Conveying (Dilute Phase) – OQ Protocol

Test Plan

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Perform containment seal integrity test during docking. Seal integrity maintained; no leaks detected. Test report with seal integrity results.

Detailed Test Cases

Test Case ID: PQ-001

Procedure: Conduct the containment seal integrity test while docking the SBV Transfer System. Utilize appropriate detection methods to identify any leaks.

Acceptance Criteria: The seal must maintain integrity with no detectable leaks during the docking process.

Evidence: Documented test results and any observations made during the test.

Deviations

Any deviations from the established protocol must be documented and justified. A deviation report must be created and approved by the Quality Assurance team.

Approvals

Prepared by: [Name], Validation Team

Approved by: [Name], Quality Assurance

Date: [Approval Date]