Document ID: PQ-SI-001
Version: 1.0
Effective Date: YYYY-MM-DD
Prepared by: [Your Name]
Approved by: [Approver’s Name]
Performance Qualification Protocol for Static Incubator in Biologics Upstream Processing
Objective: To ensure that the Static Incubator operates within specified parameters to support cell incubation in the production area, meeting the defined acceptance criteria.
Scope: This protocol applies to the Performance Qualification of the Static Incubator used in the Production/Cell Culture area for biologics upstream processing.
Responsibilities:
- Validation Team: Prepare, execute, and document the PQ protocol.
- Quality Assurance: Review and approve the PQ protocol and results.
- Production Personnel: Ensure proper operation and maintenance of the Static Incubator.
Prerequisites:
- Installation Qualification (IQ) must be completed and approved.
- Operational Qualification (OQ) must be completed and approved.
- Personnel trained on the operation of the Static Incubator.
Equipment Description:
The Static Incubator is designed for cell incubation, providing controlled temperature conditions critical for cell culture processes. The incubator features temperature uniformity monitoring through PLC logs.
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| PQ-SI-01 | Verify temperature uniformity using PLC logs. | Temperature uniformity within ±2°C of setpoint. | PLC log reports. |
| PQ-SI-02 | Perform a 24-hour stability test. | Temperature remains stable within ±2°C. | Stability test report. |
Detailed Test Cases:
Test Case PQ-SI-01:
- Access the PLC logs for the Static Incubator.
- Record the temperature readings at specified intervals.
- Analyze data for temperature uniformity.
Test Case PQ-SI-02:
- Set the incubator to the desired temperature.
- Monitor temperature continuously for 24 hours.
- Document any deviations and ensure corrective actions are taken.
Deviations:
Any deviations from the acceptance criteria must be documented and investigated. Corrective actions must be implemented and verified.
Approvals:
All results must be reviewed and approved by the Quality Assurance department before final validation of the Static Incubator.
Data Integrity Checks:
- Ensure PLC logs are automatically recorded and time-stamped.
- Regular audits of log files to confirm data accuracy and completeness.
- Backup of log data at defined intervals to prevent data loss.