| URS ID | URS Statement | Risk (H/M/L) | DQ Test Ref | IQ Test Ref | OQ Test Ref | PQ Test Ref | Evidence/Record | Result |
|---|---|---|---|---|---|---|---|---|
| URS-001 | Ensure TMP is maintained within specified limits during operation. | H | DQ-001 | IQ-001 | OQ-001 | PQ-001 | TMP Log | [Pass/Fail] |
| URS-002 | Verify flow rates meet operational requirements. | M | DQ-002 | IQ-002 | OQ-002 | PQ-002 | Flow Rate Record | [Pass/Fail] |
| URS-003 | Confirm membrane integrity before and after use. | H | DQ-003 | IQ-003 | OQ-003 | PQ-003 | Membrane Integrity Test Report | [Pass/Fail] |
| URS-004 | Ensure temperature remains within specified limits during operation. | M | DQ-004 | IQ-004 | OQ-004 | PQ-004 | Temperature Log | [Pass/Fail] |
| URS-005 | Audit trail must be maintained for all critical parameters. | L | DQ-005 | IQ-005 | OQ-005 | PQ-005 | Audit Trail Record | [Pass/Fail] |