Objective
The objective of this Installation Qualification (IQ) protocol is to verify that the Top Pan Balance is installed correctly, operates according to the specified requirements, and is ready for use in weighing bulk samples in the QC Laboratory.
Scope
This protocol applies to the Installation Qualification of the Top Pan Balance located in the QC Laboratory, which is used for weighing bulk samples with direct product impact.
Responsibilities
- Validation Team: Responsible for executing the IQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the IQ protocol and results.
- Laboratory Personnel: Responsible for operating the Top Pan Balance and reporting any discrepancies.
Prerequisites
- Installation of the Top Pan Balance must be completed.
- All necessary utilities (power, calibration weights) must be available.
- User training must be completed for all personnel operating the equipment.
Equipment Description
The Top Pan Balance is an instrument designed for weighing bulk samples with high accuracy and repeatability. It is critical for ensuring the integrity of the analytical processes in the QC Laboratory.
Test Plan
| Test ID | Procedure | Acceptance | Evidence |
|---|---|---|---|
| IQ-TPB-001 | Verify installation against manufacturer specifications. | All specifications are met. | Installation checklist signed off. |
| IQ-TPB-002 | Check functionality and calibration of the balance. | Accuracy within ±0.01g. | Calibration certificate and test results. |
| IQ-TPB-003 | Document operational checks. | All checks performed successfully. | Operational logbook entries. |
Detailed Test Cases
Test Case 1: Installation Verification
Procedure: Check the physical installation of the Top Pan Balance to ensure compliance with manufacturer specifications.
Acceptance Criteria: All specifications must be met as per the installation checklist.
Evidence: Signed installation checklist.
Test Case 2: Calibration Check
Procedure: Perform a calibration check using certified weights.
Acceptance Criteria: The balance must show accuracy within ±0.01g.
Evidence: Calibration certificate and documented results.
Test Case 3: Operational Check
Procedure: Conduct operational checks to ensure the balance functions as intended.
Acceptance Criteria: All operational checks must be successful without error.
Evidence: Entries in the operational logbook.
Deviations
Any deviations from the acceptance criteria must be documented, investigated, and resolved prior to the conclusion of the IQ protocol.
Approvals
All results must be reviewed and approved by the Quality Assurance team prior to the equipment being deemed qualified for use.