Zeta Potential Analyzer – OQ Protocol

Document Control Number: OQ-ZPA-001

Version: 1.0

Date: 2023-10-01

Prepared by: [Your Name]

Approved by: [Approver Name]

Operational Qualification Protocol for Zeta Potential Analyzer

Objective: To validate the operational performance of the Zeta Potential Analyzer for accurate surface charge measurements in compliance with URS Annex11.

Scope: This protocol applies to the Zeta Potential Analyzer utilized in the QC/R&D area for critical NDDS analytics.

Responsibilities:

  • Validation Team: Preparation and execution of the protocol.
  • Quality Assurance: Review and approval of the protocol.
  • Equipment Operator: Conducting tests and documenting results.

Prerequisites:

  • Training on Zeta Potential Analyzer operation.
  • Completion of Installation Qualification (IQ).
  • Availability of calibration standards.

Equipment Description:

The Zeta Potential Analyzer is an instrument used to measure the surface charge of particles in a suspension, providing critical data for NDDS applications. It ensures quality through precise measurements of zeta potential, which is vital for product stability and performance.

Test ID Procedure Acceptance Criteria Evidence
OQ-01 Verify accuracy of zeta potential measurements using standard reference materials. Measurements must be within ±5% of the known values. Calibration report and measurement logs.
OQ-02 Assess repeatability by performing multiple measurements on the same sample. Standard deviation must not exceed 3% of the mean value. Statistical analysis report.
OQ-03 Review audit trail functionality to ensure data integrity. All user actions must be logged with timestamps. Audit trail report.
See also  Co-Mill / Conical Mill – Qualification Certificate Template

Detailed Test Cases:

Test Case OQ-01:

  • Use standard reference materials with known zeta potential values.
  • Record the measured values and compare with known values.
  • Document results in the measurement log.

Test Case OQ-02:

  • Prepare the same sample for multiple measurements.
  • Perform at least 5 measurements and record results.
  • Calculate the mean and standard deviation.
  • Document findings in the statistical report.

Test Case OQ-03:

  • Access the audit trail feature of the analyzer.
  • Review logs for completeness and accuracy.
  • Ensure all actions are logged with appropriate timestamps.
  • Document findings in the audit trail report.

Deviations: Any deviations from the acceptance criteria must be documented and justified. Investigate root causes and implement corrective actions as necessary.

Approvals:

  • Validation Team Lead: ___________________ Date: _____________
  • Quality Assurance Manager: ______________ Date: _____________

Data Integrity Checks:

  • Ensure all data entries are timestamped and attributed to the respective operator.
  • Regularly back up data to prevent loss.
  • Review data logs for any anomalies during testing.