Validation Summary Report (VSR)
Equipment Information
Equipment: WFI Storage Tank
Subcategory: Utilities (Water Systems)
Area: Utilities
DQ/IQ/OQ/PQ Flags: Yes/Yes/Yes/Yes
Acceptance Criteria Reference: URS Annex15
Key Critical Parameters: Temp microbial integrity level
Requalification Frequency: 12M
Summary
This Validation Summary Report outlines the validation activities conducted for the WFI Storage Tank, ensuring compliance with regulatory requirements and internal standards.
Scope and Boundaries
The scope of this validation encompasses the design, installation, operation, and performance qualifications of the WFI Storage Tank within the Utilities area. This report includes all relevant documentation and protocols executed during the validation process.
Executed Protocol List
- DQ Protocol
- IQ Protocol
- OQ Protocol
- PQ Protocol
Deviations Summary
No deviations were noted during the execution of the validation protocols. All activities were performed as per the approved protocols.
CPP Verification Summary
The critical process parameters (CPPs) related to temperature and microbial integrity were verified and found to be within acceptable limits as defined in the acceptance criteria.
Conclusion
The validation of the WFI Storage Tank has been successfully completed in accordance with the established protocols and acceptance criteria. The system is deemed qualified for its intended use in the Utilities area.
Attachments Index
- Executed DQ Protocol
- Executed IQ Protocol
- Executed OQ Protocol
- Executed PQ Protocol
- Validation Summary Report
Approvals
_____________________
Validator Name
Title
Date
_____________________
Quality Assurance Name
Title
Date