Operational Qualification Protocol for Non-Jacketed Mixing Tank
Document Number: OQ-001
Version: 1.0
Effective Date: 2023-10-01
Prepared By: [Name]
Reviewed By: [Name]
Approved By: [Name]
Objective
The objective of this Operational Qualification (OQ) protocol is to verify that the Mixing Tank (Non-Jacketed) operates according to the defined requirements and meets the specified acceptance criteria for mixing non-sterile liquids.
Scope
This protocol applies to the Mixing Tank (Non-Jacketed) used in the production of non-sterile liquids, including oral liquids, syrups, and suspensions. The testing will confirm that the equipment operates effectively within defined parameters.
Responsibilities
- Validation Team: Responsible for executing the OQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the protocol and results.
- Production Team: Responsible for providing necessary operational support during testing.
Prerequisites
- Completion of Installation Qualification (IQ).
- Training of personnel on the operation of the Mixing Tank.
- Availability of necessary materials for testing.
Equipment Description
The Mixing Tank (Non-Jacketed) is designed for the mixing of non-sterile liquids. The primary features include:
- Capacity: [Insert capacity]
- Agitation mechanism: [Insert type]
- Control panel: [Insert details]
Test Plan
| Test ID | Procedure | Acceptance | Evidence |
|---|---|---|---|
| OQ-001 | Verify agitation speed at specified RPM. | Within ±5% of target RPM. | RPM measurement logs. |
| OQ-002 | Measure mixing time for specified duration. | Mixing completed within defined time. | Time logs and visual inspection. |
Detailed Test Cases
Test Case OQ-001
Objective: Verify agitation speed.
Procedure: Set the Mixing Tank to the target RPM and measure with a calibrated RPM meter.
Acceptance Criteria: The RPM must be within ±5% of the target.
Expected Outcome: RPM readings are within the specified range.
Test Case OQ-002
Objective: Measure mixing time.
Procedure: Start the mixing process and time the duration until the desired consistency is achieved.
Acceptance Criteria: Mixing must be completed within the defined time frame.
Expected Outcome: Mixing completes as per the defined timeline.
Deviations
Any deviations from the acceptance criteria must be documented and assessed for impact on the validation process. A corrective action plan should be developed and approved by the validation team.
Approvals
This protocol requires approvals from the Quality Assurance and Validation teams before execution.