Document Control Number: IQ-MT-001
Version: 1.0
Effective Date: [Insert Date]
Review Date: [Insert Date]
Installation Qualification Protocol for Mixing Tank in Non-Sterile Liquids Production
Objective: To ensure that the Mixing Tank (Non-Jacketed) is installed correctly and operates according to the defined specifications for mixing non-sterile liquids.
Scope: This protocol applies to the Installation Qualification of the Mixing Tank used in the production of oral liquids, syrups, and suspensions within the manufacturing area.
Responsibilities:
- Validation Team: Responsible for executing and documenting the IQ protocol.
- Quality Assurance: Responsible for reviewing and approving the IQ documentation.
- Production Team: Responsible for providing access to the equipment and necessary operational details.
Prerequisites:
- Installation of the Mixing Tank must be completed.
- All necessary utilities (water, electricity) must be connected and functional.
- Personnel must be trained on the equipment operation.
Equipment Description:
The Mixing Tank is a non-jacketed vessel designed for mixing non-sterile liquids such as oral liquids, syrups, and suspensions. It features adjustable agitation speed and a capacity of [Insert Capacity].
| Test ID | Procedure | Acceptance | Evidence |
|---|---|---|---|
| IQ-001 | Verify installation according to manufacturer specifications. | All components installed as per specifications. | Installation checklist. |
| IQ-002 | Check utility connections (water, electricity). | Utilities are connected and functional. | Utility connection log. |
| IQ-003 | Conduct agitation speed test. | Agitation speed within specified range. | Agitation speed measurement report. |
| IQ-004 | Measure mixing time for specified liquid. | Mixing time meets defined criteria. | Mixing time log. |
Detailed Test Cases:
- Test ID: IQ-001
- Procedure: Review installation documentation and verify against equipment.
- Acceptance Criteria: All components installed as per specifications.
- Evidence: Installation checklist signed by the validation team.
- Test ID: IQ-002
- Procedure: Inspect and confirm all utility connections are secure and operational.
- Acceptance Criteria: Utilities are connected and functional.
- Evidence: Utility connection log reviewed and signed.
- Test ID: IQ-003
- Procedure: Set agitation speed and verify with calibrated instrument.
- Acceptance Criteria: Agitation speed within specified range.
- Evidence: Agitation speed measurement report.
- Test ID: IQ-004
- Procedure: Mix a specified liquid and record the time taken.
- Acceptance Criteria: Mixing time meets defined criteria.
- Evidence: Mixing time log documented by the operator.
Deviations: Any deviations from the acceptance criteria must be documented in a deviation report and approved by Quality Assurance.
Approvals:
- Validation Team Lead: ___________________ Date: ___________
- Quality Assurance Manager: ______________ Date: ___________
- Production Supervisor: __________________ Date: ___________