Document Number: DQ-001
Version: 1.0
Effective Date: 2023-10-01
Reviewed By: [Name]
Approved By: [Name]
Design Qualification Protocol for Jacketed Mixing Vessel
Objective: To validate the design and functionality of the Jacketed Mixing Vessel used for manufacturing semi-solid dosage forms, ensuring it meets specified requirements and operates within defined parameters.
Scope: This protocol applies to the Jacketed Mixing Vessel utilized in the production of creams, gels, lotions, located in the Production/Manufacturing area.
Responsibilities:
- Validation Team: Overall execution and documentation of the DQ protocol.
- Quality Assurance: Review and approval of the DQ documentation.
- Production Team: Operation of the equipment during testing.
Prerequisites:
- Completion of User Requirements Specification (URS).
- Installation Qualification (IQ) must be completed prior to DQ execution.
- Staff training on equipment operation and safety protocols.
Equipment Description:
The Jacketed Mixing Vessel is a stainless steel vessel equipped with temperature control, agitation mechanisms, and PLC logging capabilities. It is designed for the mixing of semi-solid formulations such as creams, gels, and lotions.
| Test ID | Procedure | Acceptance | Evidence |
|---|---|---|---|
| DQ-001-01 | Verify temperature control functionality. | Temperature maintained within ±2°C of set point. | Temperature logs from PLC. |
| DQ-001-02 | Check agitation speed settings. | Agitation speed within specified range. | Agitation speed logs from PLC. |
| DQ-001-03 | Confirm hold time accuracy. | Hold time matches the specified duration. | PLC logs confirming hold time. |
Detailed Test Cases:
- Test Case DQ-001-01: Conduct a test run to verify that temperature control maintains the specified set point throughout the mixing process. Log temperature readings every 5 minutes.
- Test Case DQ-001-02: Set the agitation speed to the specified RPM. Verify that the actual speed matches the set speed using the PLC interface.
- Test Case DQ-001-03: Initiate a mixing cycle and record the time. Validate that the hold time is accurately recorded in the PLC.
Deviations: Any deviations from the acceptance criteria must be documented and assessed for impact on product quality and compliance. A corrective action plan should be developed as necessary.
Approvals:
- Validation Team Lead: ___________________ Date: __________
- Quality Assurance Manager: _______________ Date: __________
Data Integrity Checks: Ensure that all PLC logs are backed up and secured, with access limited to authorized personnel. Regular audits of log data should be performed to verify consistency and accuracy.