Case Packer – OQ Protocol

Document Control:

Document ID: OQ-CP-001

Version: 1.0

Effective Date: [Insert Date]

Review Date: [Insert Date]

Prepared By: [Insert Name]

Approved By: [Insert Name]

Operational Qualification Protocol for Case Packer in IV Infusions Packaging

Meta Description: This document outlines the Operational Qualification (OQ) protocol for the Case Packer used in the packaging of IV infusions, ensuring compliance with URS Annex11.

Tags: Equipment Validation, Operational Qualification, Case Packer, IV Infusions, Packaging, Quality Assurance

Objective

The objective of this Operational Qualification (OQ) protocol is to verify that the Case Packer operates according to specified requirements and is capable of consistently producing quality output in the packaging of IV infusions.

Scope

This protocol applies to the Operational Qualification of the Case Packer used in the Packaging/Secondary area for IV Infusions (LVP/SVP – Bags/Bottles). It covers the equipment’s performance in packing cartons into shippers.

Responsibilities

  • Validation Team: Responsible for executing the OQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the protocol and results.
  • Operations: Responsible for providing access to the equipment and necessary resources.

Prerequisites

  • Completion of Installation Qualification (IQ).
  • Training of personnel on the operation of the Case Packer.
  • Availability of necessary materials and resources for testing.

Equipment Description

The Case Packer is designed to automatically pack cartons containing IV infusion products into shippers. It is equipped with features to ensure pack integrity and an audit trail for compliance purposes.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-CP-01 Verify pack integrity audit trail functionality. Audit trail logs accurately reflect all packing operations. Audit trail report.
OQ-CP-02 Confirm packing speed and efficiency. Packaging speed meets specified URS requirements. Speed test results.
OQ-CP-03 Check for proper carton placement in shippers. 100% of cartons are correctly placed without damage. Visual inspection report.
See also  Drum Tippler/Drum Tumbler – Deviation Impact Assessment

Detailed Test Cases

Test Case OQ-CP-01

Objective: Verify the pack integrity audit trail functionality.

Procedure: Execute a series of packing operations and review the generated audit trail logs.

Acceptance Criteria: Audit trail logs accurately reflect all packing operations.

Evidence: Documented audit trail report.

Test Case OQ-CP-02

Objective: Confirm packing speed and efficiency.

Procedure: Measure the output of the Case Packer over a defined period.

Acceptance Criteria: Packaging speed meets specified URS requirements.

Evidence: Speed test results documentation.

Test Case OQ-CP-03

Objective: Check for proper carton placement in shippers.

Procedure: Conduct a visual inspection of packed shippers.

Acceptance Criteria: 100% of cartons are correctly placed without damage.

Evidence: Visual inspection report.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A corrective action plan should be developed to address any identified issues.

Approvals

Prepared By: [Insert Name]
Date: [Insert Date]

Approved By: [Insert Name]
Date: [Insert Date]